Discovery of the code RCC-E (2012, 2016), Manufacturing and Qualification of Electrical  Equipment (2012 - 2016), Specialization "Inspection" (2012), Upgrade RCC-E 2012 -> 2016
  • Domain: EI&C
  • Duration: 1 to 4 days
  • Languages: French, English
  • Location: in France

RCC-E 2012 - Qualification and manufacturing of electrical equipment (Ref. SICA E1602)

  • Reference: E-002
  • Duration: 3 days
  • Languages: French, English

RCC-E 2012 - Qualification and manufacturing of electrical equipment (Ref. SICA F-1703)

  • Reference: E-006
  • Duration: 2 days
  • Languages: French
  • Location: In France
  • Format: Face to face

RCC-E 2012 - Specialization “Inspection” (Ref. SICA F-1502)

  • Reference: E-005
  • Duration: 1 day
  • Languages: French
  • Location: In France
  • Format: Face to face

RCC-E 2019 - Inspection and manufacturing of an electrical equipment (Ref. SICA F2302)

  • Reference: E-015
  • Duration: 2 days
  • Languages: French
  • Location: In France
  • Format: Face to face

RCC-E 2019 - Qualification and manufacturing of an electrical equipment (Ref. SICA E-2004)

  • Reference: E-013
  • Duration: 2 days
  • Languages: French, English
  • Location: In France
  • Format: Face to face

RCC-E 2019 - Qualification and manufacturing of electrical equipment (Ref. SICA E2001)

  • Reference: E-010
  • Duration: 3 days
  • Languages: French, English
  • Location: In France
  • Format: Face to face

RCC-E 2019 -All sections (Ref. SICA F2301)

  • Reference: E-014
  • Duration: 2 days
  • Languages: French
  • Location: In France
  • Format: Face to face

Upgrade RCC-E 2012 - 2019 (Ref. SICA F2002)

  • Reference: E-012
  • Duration: 1 day
  • Languages: French
  • Location: In France
  • Format: Face to face